Maintaining the Planning File Overview

The planning file basically contains all materials that may be relevant for a planning run. If a change is made which is relevant to planning, (for example, the creation of a purchase order), the material is automatically provided with a total change indicator in the planning file. If a change within the planning horizon occurs (for example, the creation of a purchase order within the planning horizon), then the material is automatically provided with another indicator, that is, the net change planning indicator.

The material is included in the next planning run and the respective indicator is deleted once the planning run is completed:

  • Both the total change indicator and the net change planning indicator are deleted in regenerative planning and in net change planning.
  • Only the net change planning indicator is deleted in net change planning in the planning horizon.

Prerequisites for successful entries in the planning file include the following two points:

  • material requirements planning must be activated for the corresponding plant
  • the materials must have a valid MRP type

Displaying Entries in the Planning File

Creating Entries in the Planning File

Planning File: Consistency Check